End Cabin
- -118, 71, 1054 Map Link
- 1.8 warp location & main End portal
- The cabin was built sometime between 2011 and 2015
- The End portal room was built in 2023 by Tomoekhoa and Kat
- The portal room had to be flipped to work with the new warp hub, which left the cabin ladder entrance in disarray